Semiconductors
As the world progresses towards digitization – smart and connected devices, technological advancements, etc. – the Semiconductor (FAB) Industry is expanding to achieve faster time to market and cost-effective chips.
These FABs require stringent environmental controls, cleanrooms, and sophisticated equipment to operate at a high level of precision and automation to ensure the production of reliable and high-performance semiconductor devices.
Total World Automation (TWA) LLC has subject matter experts and experience in engineering, systems integration, and commissioning FABs during the Base Build (BB) and Tool Install (TI) stages of the project life cycle.
Base Build

Base Build (BB) consists of executing construction of the facility’s infrastructure and utilities out of a complete set of construction documents that have been fully coordinated, validated, and approved.
Through a series of design phases TWA provides EI&C Engineering services to produce the construction document set that enables Base Build. We start by evaluating preliminary studies, collected data, requirements, budget, schedule, seek for issues and devise a design plan and solutions.
TWA enforces the “BASE” principle for all BB needs:
B – Balanced Cost
A – Agile design execution
S – Standards base Quality
E – Engineer for changing requirements
Tool Installation

TWA covers all EI&C design aspects of semiconductor Tool Installation requirements. We analyze the Tool Utility Matrix (TUM) requirements, perform a gap analysis, and design appropriate electrical, instrumentation, controls, communications, and life safety system interface for each manufacturing equipment (tool). This effort also demands tight coordination with all other disciplines, integrating the equipment to the facility, providing value engineering, cost and schedule optimization, and implementing personnel health and safety safeguards.
TWA enforces the “TOOL” principle for all TI project needs:
T – Technically Proven concepts
O – Optimized Cost
O – Occupational Safety
L – Lean Construction
Collaborate with TWA to deliver BB and tailored TI solutions
with proven principles that meet the Owner’s and manufacturer’s requirements.